CozyMK4.com
Pages
Home
Rough River 2012 Photos
Chapters
Ch 10 and 11
Ch 12
Ch 14
Ch 4
Ch 5
Ch 6
Ch 7
Ch 8
Ch 9
Misc
Sunday, June 30, 2013
Landing brake actuator test
Overview of rear belly area.
Installing actuator on landing brake.
Modifying back of landing gear cover to allow for gear bow.
Monday, June 24, 2013
Landing gear leg fairings and cover complete.
Saturday, June 22, 2013
Floxed trailing edges, and 2 x BID on top side of leg faring.
Flox corners and outside BID. Outside of cover finished.
Friday, June 21, 2013
Building the landing gear cover
2 BID on underside of fairings.
Monday, June 17, 2013
Attaching Eureka main gear fairings with micro.
Sunday, June 16, 2013
Everything fits perfectly!
Tuesday, June 11, 2013
Trial fit of disc and caliper
Right side trimmed.
Axels floxed in place.
Sunday, June 2, 2013
Fabricating aluminum back plates
Preparing to mount axels
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)